Kinloid under scaffold with the roof boarded, behind the Oakover site sign
In Progress

Kinloid

Mallaig 2026
ICFNew BuildLive Build

Kinloid is a new home near Mallaig built using insulated concrete formwork (ICF): interlocking insulated blocks filled with concrete to form a highly insulated, airtight structure, with a steel frame and timber roof above.

This page follows the build as it happens, with regular updates from site.

Build diary

  1. July 2026

    Roof structure on

    The roof rafters and sarking boards are on over the steel frame and ICF walls, and the internal stud walls are going up.

  2. June 2026

    Slab poured

    The ground floor slab is poured inside the ICF walls, around the steel frame.

  3. June 2026

    Steel frame, ICF walls and slab preparation

    The steel frame is up and the first courses of ICF blocks are laid, with the sub-base, damp-proof membrane and steel reinforcement going down ready for the slab.

  4. June 2026

    Below-ground drainage

    Underground drainage laid in a bed of gravel before the slab goes in.